๐Ÿญ FACTORY EMPIRES V20.14

Isometric Tycoon ยท Mobile + PC ยท All money is virtual
โ— READY
Factory cash$50,000
Output capacity80 UPH
Good units0
CalendarYear 1 ยท Day 1
Last shift profit$0
Work in process0

๐Ÿ“Š Factory Command Center

Your live production diagnosis ยท See what is limiting output and what to fix next.
๐Ÿง  Factory Intelligence
Loading accessโ€ฆ
Virtual cash only

Basic factory KPIs are free. Purchase time-limited advanced diagnostics, bottleneck guidance, and upgrade forecasts.

Estimated good UPHโ€”After losses
Line capacityโ€”Before staffing / material limits
Quality yieldโ€”Target โ‰ฅ 98%
Last shift profitโ€”Cash performance

Station capacity ยท Where is the bottleneck?

Station UPH is per line. Total output also depends on lines, employees, machine health, layout, quality and raw materials.

๐Ÿšฆ What should I do next?

๐Ÿ”Ž Upgrade impact preview

Estimates are based on current station cycles and constraints. Actual output may differ due to materials, staffing, maintenance, quality and factory events. Preview does not spend cash.

Factory health at a glance

Premium Tycoon Production Floor

๐ŸŸข READY TO START
Production is ready. Select Start production when you are ready.
๐ŸŸข Ready / contract completed   ยท   ๐ŸŸก Running   ยท   ๐Ÿ”ด Stopped by issue
๐Ÿ™๏ธ Factory expansion now lives in Factory World. Select a building on the campus to purchase facilities, add lines, and inspect available bays. Go to Factory World โ†“

๐Ÿญ Production Lines by Facility

Purchased lines appear below and as separate lanes on the factory floor. Facilities have expandable capacities of 2, 4, 6, 10, and 16 lines.

๐ŸŒ† Factory World ยท Your Industrial Empire

Purchase additional facilities, fill their production bays, and switch between locations. New lines add real capacity and operating demand.

๐ŸŒ† Factory World ยท Industrial Campus

Tap a building to select its factory
๐Ÿญ Starter Factory ยท Owned
Owned facilityLocked facility๐Ÿ—๏ธ Buildings unlock as you expand
Organized facility view: each lane has Assembly โ†’ Testing โ†’ Packaging โ†’ Shipping, with a dedicated material aisle. The original animated floor remains below for workstation editing.
โฑ๏ธ Station Cycle TimesFinding bottleneckโ€ฆ
Seconds per unit ยท Higher time means slower output ยท Tap a station to inspect its machine
Tap a machine to inspect ยท Drag to pan
๐ŸŸก Gold machine = bottleneck ยท Orange crates = queued WIP ยท Layout mode: drag machines to move them. Normal mode: drag to pan.
Start production to watch the factory run.
Selected stationTesting
Cycle time45 sec
Production lines1
Buildings1
Operators8
Shift length

๐Ÿ† Missions & Daily Rewards

Earn rewards and grow your empire. Buy facilities and production lines in Factory World above.

Factory prestige0 โญ
๐ŸŽ Daily manager bonus

Claim a virtual cash reward once per local calendar day.

All rewards are virtual. No purchases or real advertisements are active.

๐Ÿ—“๏ธ Career mode ยท Production calendar

Year 1 ยท Month 1 ยท Day 1
0%
5
Unlimited career ยท Pausing preserves shift progress ยท No real-money transactions

โš™๏ธ Selected workstation upgrades

Testing
45s
80 UPH
$3,000
Testing
Upgrade any station. Moving equipment adds a material-travel penalty if stations are farther apart. Tap a machine, then drag it while Layout Mode is active. Station placement is saved.

๐Ÿ‘ท Workforce & production schedule

Operator skill level1
Team morale85%
Absent today0

Shift scheduling

Scheduled workdays / week5

Shift duration changes output and labor costs. Workdays are a planning setting for future scheduling challenges; complete-shift remains one production day.

๐Ÿ”ฌ Research & factory scorecard

R&D technology level0

Each research level improves effective UPH by 2%. Training also boosts output but increases wages.

Factory performance

Quality yield96%
Machine availability proxy100%
Estimated OEE-style scoreโ€”
Contracts delivered / missed0 / 0
Operating margin (cumulative)โ€”

Simplified gameplay indicators; OEE-style score is not an industrial-grade OEE calculation.

Factory Empires uses a lightweight isometric production simulator. Progress is saved in this browser; use Settings โ†’ Save & Backup to transfer it to another device.

๐Ÿ“ฆ Warehouse & Suppliers

Raw material stock12,000 / 30,000
Incoming shipment0
Current weekdayMon
Next deliveryNone
Stock coverageโ€”
Material purchases (lifetime)$0

Orders cost virtual cash upfront. Each shipment has its own delivery date (2 calendar days). Arrivals are processed even on days off. Material purchases are tracked separately from shift operating costs.

๐Ÿ“… Production Workweek

Choose operating days. On a scheduled day off, finishing a shift advances the calendar without manufacturing output.

๐Ÿ‘ท Station Assignments

Assign your existing workforce across stations. A station with fewer than two operators reduces line capacity.

Assembly2
Testing2
Packaging2
Shipping2

๐Ÿ“Š Shift Financials & Disruptions

Revenue$0
Labor$0
Fixed overhead$0
Material purchases$0
Unexpected expenses$0

No recent disruptions

Materials are expensed when purchased; revenue and labor are reported per shift. Total lifetime profit includes inventory purchases.

๐Ÿฌ Factory Empires Marketplace

Factory cash is earned through production. Premium items are concepts only; real-money checkout is not active.

๐Ÿช™ Factory Cash Store

Operational purchases use your virtual balance.

Raw materials Warehouse controls above
Machine upgrades Station controls
Training and R&D Workforce controls
Factory Intelligence Daily / Weekly / Monthly

๐Ÿ’Ž Premium Store ยท Coming Later

Automotive Expansion $4.99 USD
Electronics Expansion $4.99 USD
Advanced Robotics $6.99 USD
Ad-free upgrade $2.99 USD

No payments are collected. Prices are proposed and subject to change.